Glenwood Street Reconstruction 43rd Ave East to 60th Ave East Residential Design Meeting Agenda Thursday February 25, 2010 at 6:00 p.m. City of Duluth Project No.’s 0244TR and 0647TR

INTRODUCTIONS:

Cindy Voigt, P.E. City of Duluth, City Engineer 730-5071 cvoigt@duluthmn.gov
Matthew Decur, P.E. City of Duluth, Project Engineer 730-5104 mdecur@duluthmn.gov
David Salo, P.E. Salo Engineering, Principle in Charge 727-8796 dsalo@saloeng.com
David Bolf, P.E. Salo Engineering, Project Manager 727-8796 dbolf@saloeng.com
Chris Shaw Salo Engineering, Project Engineer
Doug Kerfeld Salo Engineering, Project Engineer

BACKGROUND:

  1. Glenwood Street is a Municipal State Aid Route.
  2. Old and failing utilities will be replaced with utility funds.
  3. Current project status.
  4. Project schedule – please refer to schedule on back of this sheet. Discuss staging.
  5. The City of Duluth will hold a Public Hearing for assessment on March 9, 2010.

PROJECT DESCRIPTION:

  1. Roadway Improvements
    1. Complete roadway reconstruction from 43rd Ave East to 60th Ave East.
    2. Roadway width will increase from 36’ to 38’ with 10’ parking lane on the north side and 6’ shoulder on the south side, and a 5’ boulevard and 5’ sidewalk on both sides. Residents with affected steps will be rebuilt with railing when there are 3 or more steps.
    3. Horizontal and vertical alignments will match the existing roadway.
  2. Water Main – The water main from Crosley Ave to 60th Ave East will be replaced with new HDPE water main. We will be placing temporary water for all residents. A letter will be sent out to further describe this work.
  3. Sanitary Sewer – The sanitary sewer is quite old and has many bad sections. It will be completely replaced with new PVC sanitary sewer main.
  4. Storm Sewer – The entire storm sewer system will be redesigned to accommodate the new roadway. Additional catch basins will be installed.
  5. Gas Main – The City of Duluth plans to remove 3” gas from Crosley Ave to 48th Ave East.

CONSTRUCTION INFORMATION ITEMS:

  1. Roadway will be closed to through traffic during construction. Detour routes will be in place from May 2010 – November 2010 and from May 2011 – September 2011.
  2. Access to driveways.
  3. Garbage collection and mail delivery.
  4. School bus routes and DTA bus routes.
  5. Lester Park School access.
  6. Pedestrian traffic.
  7. Resident Construction Meeting.
  8. Weekly Construction Meetings.
  9. Construction Newsletters – BLOG – www.saloeng.com/glenwood/

OPEN FOR GENERAL QUESTIONS INDIVIDUAL RESIDENT MEETING:

Leader:
Group 1 – 43rd Ave East to 47th Ave East Addresses 4302-4631 David Bolf
Group 2 – 47th Ave East to 49th Ave East Addresses 4701-4839 Matt Decur
Group 3 – 49th Ave East to 51st Ave East Addresses 4901-5032 David Salo
Group 4 – 51st Ave East to 53rd Ave East Addresses 5102-5231 Chris Shaw
Group 5 – 53rd Ave East to 57th Ave East Addresses 5301-5432 Doug Kerfeld
Group 6 – 57th Ave East to 60th Ave East Addresses 5701-5828 Cindy Voigt

PROJECT SCHEDULE:

(click to enlarge)

DETOUR ROUTES:

(click to enlarge)