Glenwood Street Reconstruction 43rd Ave East to 60th Ave East Residential Design Meeting Agenda Thursday February 25, 2010 at 6:00 p.m. City of Duluth Project No.’s 0244TR and 0647TR
INTRODUCTIONS:
| Cindy Voigt, P.E. | City of Duluth, City Engineer | 730-5071 | cvoigt@duluthmn.gov |
| Matthew Decur, P.E. | City of Duluth, Project Engineer | 730-5104 | mdecur@duluthmn.gov |
| David Salo, P.E. | Salo Engineering, Principle in Charge | 727-8796 | dsalo@saloeng.com |
| David Bolf, P.E. | Salo Engineering, Project Manager | 727-8796 | dbolf@saloeng.com |
| Chris Shaw | Salo Engineering, Project Engineer | ||
| Doug Kerfeld | Salo Engineering, Project Engineer |
BACKGROUND:
- Glenwood Street is a Municipal State Aid Route.
- Old and failing utilities will be replaced with utility funds.
- Current project status.
- Project schedule – please refer to schedule on back of this sheet. Discuss staging.
- The City of Duluth will hold a Public Hearing for assessment on March 9, 2010.
PROJECT DESCRIPTION:
- Roadway Improvements
- Complete roadway reconstruction from 43rd Ave East to 60th Ave East.
- Roadway width will increase from 36’ to 38’ with 10’ parking lane on the north side and 6’ shoulder on the south side, and a 5’ boulevard and 5’ sidewalk on both sides. Residents with affected steps will be rebuilt with railing when there are 3 or more steps.
- Horizontal and vertical alignments will match the existing roadway.
- Water Main – The water main from Crosley Ave to 60th Ave East will be replaced with new HDPE water main. We will be placing temporary water for all residents. A letter will be sent out to further describe this work.
- Sanitary Sewer – The sanitary sewer is quite old and has many bad sections. It will be completely replaced with new PVC sanitary sewer main.
- Storm Sewer – The entire storm sewer system will be redesigned to accommodate the new roadway. Additional catch basins will be installed.
- Gas Main – The City of Duluth plans to remove 3” gas from Crosley Ave to 48th Ave East.
CONSTRUCTION INFORMATION ITEMS:
- Roadway will be closed to through traffic during construction. Detour routes will be in place from May 2010 – November 2010 and from May 2011 – September 2011.
- Access to driveways.
- Garbage collection and mail delivery.
- School bus routes and DTA bus routes.
- Lester Park School access.
- Pedestrian traffic.
- Resident Construction Meeting.
- Weekly Construction Meetings.
- Construction Newsletters – BLOG – www.saloeng.com/glenwood/
OPEN FOR GENERAL QUESTIONS INDIVIDUAL RESIDENT MEETING:
| Leader: | ||
| Group 1 – 43rd Ave East to 47th Ave East | Addresses 4302-4631 | David Bolf |
| Group 2 – 47th Ave East to 49th Ave East | Addresses 4701-4839 | Matt Decur |
| Group 3 – 49th Ave East to 51st Ave East | Addresses 4901-5032 | David Salo |
| Group 4 – 51st Ave East to 53rd Ave East | Addresses 5102-5231 | Chris Shaw |
| Group 5 – 53rd Ave East to 57th Ave East | Addresses 5301-5432 | Doug Kerfeld |
| Group 6 – 57th Ave East to 60th Ave East | Addresses 5701-5828 | Cindy Voigt |
PROJECT SCHEDULE:
(click to enlarge)